JAZEERAH LANDFILL

UAE

As part of this project, KEO developed a waste filing plan that was designed to maximize the use of the existing cell configuration of Cells 1 and 2, and ultimately extend the life of the existing facility prior to the construction of Cell 3. The purpose of the filling plan was to establish the existing rate of infill currently experienced at Al Jazeerah Landfill, and to project future waste volumes that the facility will receive. The outcome of this task resulted in maximizing the existing waste disposal void (air space) within the current US-EPA compliant landfill configuration of Cells 1 and 2.