AZ ZOUR POWER STATION

Kuwait

MEW planned to construct a new Thermal Power Station at Az Zour North and new Open Cycle Gas Turbine Stations at each of Shuaiba and Sabiya to meet increasing power demands in Kuwait. The new Thermal Power Station is located adjacent to the existing AZ Zour South Power Station, 100 kilometers south of Kuwait City. The proposed installed capacity will be 2500MW generated by up to 6 Steam/Turbine Generator Units. The gas turbines have a combined output of 1000MW. The KEO scope covered all subsidiary buildings and infrastructure related works. The procurement methods proposed were Design Build Operate and Transfer.