Al Aweer STP Expansion, Dubai, UAE

KEO was commissioned by Dubai Municipality to carry out an assessment for the partly-constructed and completed structures associated with the Al Aweer Sewage Treatment Plant (STP) extension. KEO were then appointed at site for Supervision and Infrastructure Engineering services, in order to complete the sewerage treatment plant as originally designed. Due to rapid population expansion in Dubai, wastewater flows exceeded the plant’s design capacity of 260,000 m3/day. In order to reduce the pressure on the existing Al Aweer facility and ensure that the facility continues to provide the same high degree of treatment that it does currently, the Dubai Municipality Drainage and Irrigation Department tendered this project for the provision of engineering, procurement and construction services on a Design and Build basis for the DS-167 extension of Al Aweer STP with total capacity of 65,000 m3/d.