Dubai Metro Route 2020, UAE

The Dubai Metro Route 2020 project, or, “Route 2020”, comprises a 15 km extension of the existing Red Line from Nakheel Harbour Station to the site of Expo 2020. The Route 2020 client is the Road and Transport Authority (RTA) and the appointed Design and Construction contractor is a consortium formed between Alstom Transport (lead), Acciona Infrastructuras SA and Gulermak AS (jointly called ExpoLink).

KEO was engaged by Acciona and Gulermak to provide Value Engineering and Independent Design Verification services for the civil works across the entire route.